Description

Job Description

The Construction Scheduler will be assigned to support a portfolio of major electrical substation and transmission projects. We need Senior Schedulers with solid experience, enthusiastic to work in highly flexible, team-oriented environment and who have exceptional communication, analytical skills.

Work Location

Local to New York City.

Key Responsibilities

 

  • Ability to review and understand conceptual plans, scope documents, and designs for electrical transmission and developer interconnection projects.
  • Facilitate the preparation and creation of schedules.
  • Review the baseline/execution schedules.
  • Develops and maintains critical path logic networks and bar charts utilizing this information.
  • Perform critical path and float analysis reporting.
  • Reports schedule status to the appropriate project Company management and the client.
  • Provide analysis for the historical data, such as performed projects for future planning and forecasting.
  • Performs other responsibilities associated with this position as may be appropriate.

     

Preferred Qualifications

 

  • Four-year degree in Engineering or Construction Management or related field.
  • Extensive P6 experience.
  • In-depth knowledge / proficiency of the scope of projects within the utility industry.
  • Transmission Line (Feeder) experience is required.
  • Requires basic engineering knowledge in electrical, mechanical, civil, or a related field.
  • Excellent organizational, time-management, and communication skills.
  • Good Microsoft Office suite, particularly MS Excel, skills.
  • Good analytical and problem-solving skills.
  • Individual Contributor

Education

Any Graduate