Analysis of existing RI WCS, Yard Physicals and MES
• Analysis of Planned eWM, WCS & Yard Physicals Interfaces
POC on eWM -MFS to connect to various RI WC
• Design the feasible solution to integrate
- AVG (Auto Guided Vehicles)
- Automatic Loading
- Automated Warehouse
• Harmonize the WCS interfaces across the systems
Any Graduate