Description

Analysis of existing RI WCS,  Yard Physicals and MES  

•             Analysis of Planned eWM, WCS & Yard Physicals Interfaces 

            POC on eWM -MFS to connect to various RI WC

•           Design the feasible solution to integrate 

-                     AVG (Auto Guided Vehicles)

-                     Automatic Loading 

-                     Automated Warehouse 

•             Harmonize the WCS interfaces across the systems

Key Skills
Education

Any Graduate